Replace spreadsheets and manual PDF formatting with a purpose-built inspection platform. Capture defects on site, generate professional reports instantly.

Import your inspection data directly. Reports generate automatically in a consistent, professional format every time.
Pin defects to floor plan drawings on your phone or tablet. Photos, risk ratings, and descriptions — all in one place.
Everyone sees the same data. Track defects from identification through to close-out, across multiple assets and inspection cycles.

Upload your structural drawings and place defect pins directly on the plans. Multiple levels and elevations supported. Grid reference auto-fills from pin location.
Built-in likelihood × consequence risk matrix, fully configurable per site. Bidirectional — select L and C to get a risk rating, or select a risk code to auto-fill the matrix.


Every inspection generates a structured report: cover page, defect register, annotated drawings, and individual defect pages with photos. No formatting required.
Consultants can set up a site, run the audit, and hand over a report — or give the site team ongoing access to manage their own defect register. Flexible access tiers for every role.

No credit card required to get started.
Get started with no commitment
Get in touch to discuss pricing for your organisation